The Italian energy company said that the sale of the biomass power facilities is part of its strategy for active management and asset rotation. Included in the sale
The post Enel to sell Italian biomass portfolio to F2i for €335m appeared first on Compelo.
The first order includes 197MW in Norway from BlackRock and Zephyr. For this order, Vestas will supply 47 of its V136-4.2 MW turbines for the Guleslettene wind project in
The post Vestas secures 223MW turbine orders in Europe appeared first on Compelo.
(Mon, 02 Jul 2018) The Electric Reliability Council of Texas (ERCOT), grid operator for most of the state of Texas, estimates a reserve margin of 11% for this summerâlower than previous years and ERCOTâs 13.75% reference reserve marginâindicating a smaller cushion of resources to meet summer peak demand and an increased risk of grid stress conditions.
The new joint venture, named Ilmatar Energy, has already acquired a wind project in Finland from state-owned Metsähallitus. The acquired project, Piiparinmäki-Murtomäki, will comprise 50 turbines to generate
The existing management team will maintain an ownership position in the Company going forward. Peak is a Denver-based provider of maintenance, repair, upgrade and installation services for the
The post appeared first on Compelo.
Holes will be drilled to a minimum 250 metres (m) or deeper based on drilling conditions and brine content. The drill rig will run 24 hours per day.
The post Lithium Chile begins drilling at Ollague project in Chile appeared first on Compelo.
Following a declaration of intent to enhance collaboration in nuclear decommissioning, signed by the UK and French governments earlier this year, the NDA has developed Roadmaps of Collaboration
The post Orano signs nuclear decommissioning agreement with UK NDA appeared first on Compelo.
The acquisition will add approximately 190 barrels of oil per day (BOED) net for an acquisition price of $12 million dollars, subject to customary due diligence. The reserves
The post Royale to acquire acquire oil assets in Permian Basin and California appeared first on Compelo.
As one of the nation’s largest agricultural cooperatives, Land O’Lakes is uniquely positioned to tap into the potential power of California dairy farmers to generate renewable energy from
The post Land O’Lakes, California Bioenergy to advance Barn-to-Biogas appeared first on Compelo.
The system will cover 100% of the nation’s transmission power flow which serves more than 22 million Sri Lankans, by managing peak loads of 2,500 MW.The project has
The post GE Power strengthens Sri Lanka’s electric grid appeared first on Compelo.
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.