Energy Update

You are here

The new deal aims to ensure that nuclear energy continues to power the UK for years to come through major innovation and technology and increase diversity of the
The post UK government announces £200m sector deal to reduce nuclear energy cost appeared first on Compelo.

Under the contract, the Spanish wind turbine-maker will supply 165 of its SG 8.0-167 direct drive turbines, each with 8MW of power producing capacity. A single 8MW turbine

The firm has submitted the field development plan (FDP) for the Columbus development, which is expected to produce up to 40 million cubic feet of gas per day
The post Serica Energy seeks development plan approval for Columbus gas field in UKCS appeared first on Compelo.

While Saudi Aramco will own 30% stake in the joint venture, NOV will own the remaining 70%. Located in Ras Al-Khair, near the Jubail Industrial City on the

Breeze, the wind farm management component of Energy Cloud, will offer Encavis the ability to monitor, analyze, and manage their wind portfolio. Encavis was established in 2018, and
The post Encavis selects Greenbyte for data management appeared first on Compelo.

(Fri, 29 Jun 2018) The North American Electric Reliability Corporation's (NERC) recent <em>2018 Summer Reliability Assessment</em> finds that there are enough resources to meet this summer's projected peak electricity demand in in all areas of the country except the Electric Reliability Council of Texas (ERCOT).

(Fri, 29 Jun 2018) The State Energy Data System now features annual state-level estimates of energy production, consumption, prices, and expenditures by energy source and by sector through 2016.

The investment will see the establishment of new factory with two production lines at an existing building on the LG’s 48-acre campus in Huntsville. The new plant is
The post LG Electronics to open new solar module assembly plant in US appeared first on Compelo.

Arizona Public Service (APS) is looking to equip existing APS solar plants with battery storage and has issued an RFP to add up to 500 megawatts (MW) of energy storage to its system over the next 15 years via battery energy storage.

The contract from Wintershall has been given to Seadrill Norway Operations’s subsidiary Seadrill, which will operate the West Mira drilling rig on behalf of Northern Drilling under a
The post Northern Drilling secures rig contract for €1.1bn Nova development appeared first on Compelo.

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.