Honeywell also will provide the process design package, proprietary and non-proprietary equipment, on-site operator training, technical services for startup and continuing operation, and catalysts and adsorbents for the
The agreement involves the provision of well project management services for Tamarind’s Tui Phase 3 drilling project in New Zealand’s North Island. In line with the contract scope,
The post Petrofac bags well project management contract from Tamarind Taranki appeared first on Compelo.
The water in the Paris region is “hard”, or naturally rich in calcium carbonate (limestone). An excess of limestone in water can cause different forms of damage, from
The post SEPG, SUEZ inaugurate drinking water softening unit near Paris appeared first on Compelo.
West–East Gas Pipeline: It is a natural gas pipeline that runs from the western part of China to the east. After starting its trial run on 1 October
The post World’s major oil and gas pipelines appeared first on Compelo.
The two firms have signed an Implementation Deed which sets out the terms and key steps for the acquisition of EMC by Tag in exchange for a 32%
The post Australia’ Carnegie to sell solar/microgrid business to Tag Pacific appeared first on Compelo.
The awarded works are all within the Subsea IMR Projects segment. The scopes include seabed mapping, surveys, pipeline and structure inspection, light construction and repair work. One of
The post DOF Subsea bags contracts for Geosund and Skandi Skansen vessels appeared first on Compelo.
Located on the Pend Oreille River in Northeastern Washington State, the Boundary plant accounts to up to 30% of SCL’s annual energy needs. Under the contract, GE will
The post GE selected to refurbish three generators on 1,117MW Boundary plant in US appeared first on Compelo.
The agreement sets out terms and conditions of a long-term contract, which is planned to be finalized by the companies at a later date. As per the terms
The post Port Arthur LNG signs LNG supply agreement with Poland’s PGNiG appeared first on Compelo.
Said to be the first of several possible short-cycle developments on Block 17, the Zinia 2 project is expected to have a production capacity of 40,000 barrels per
The new deal aims to ensure that nuclear energy continues to power the UK for years to come through major innovation and technology and increase diversity of the
The post UK government announces £200m sector deal to reduce nuclear energy cost appeared first on Compelo.
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.