Energy Update

You are here

Located about 80km west of Bergen in the Norwegian continental shelf (NCS), the Equinor-operated Troll field comprises a large gas cap with a relatively thin underlying oil zone.
The post Equinor submits plans for $953m third phase of Troll field development appeared first on Compelo.

Under the contract, Vestas will repower the Marengo wind project, which was commissioned in 2007 and Marengo II wind project, commissioned in 2008, both located in Washington. PacifiCorp’s
The post Vestas wins 216 MW repowering order from PacifiCorp appeared first on Compelo.

Under the contract, Wärtsilä will supply eight Wärtsilä 50SG gas fuelled engines for the power plant which will be located in Kyaukse township, Mandalay region. China-based SEPCOIII is
The post Wärtsilä to supply equipment for 145MW gas-fired power plant in Myanmar appeared first on Compelo.

Pacific Gas and Electric Company (PG&E) this week requested approval of four energy storage projects totaling approximately 567 megawatts (MW), in a filing at the California Public Utilities Commission (CPUC).

MHI Vestas Offshore Wind A/S, the world’s second-biggest offshore wind turbine maker, is planning to use Taiwan as a hub to assemble and export turbines as it aims to extend its footprint in Asia.

The first batches of batteries from electric and hybrid vehicles are hitting retirement age, yet they aren’t bound for landfills. Instead, they’ll spend their golden years chilling beer at 7-Elevens in Japan, powering car-charging stations in California and storing energy for homes and grids in Europe.

The UK-based company will be responsible for providing the engineering, procurement and construction of subsea equipment for the Zinia Phase 2 field development. The offshore Angolan field, which
The post TechnipFMC bags contract from Total for Zinia Phase 2 field development appeared first on Compelo.

The Phoebe Solar Project (250MWAC/315MWDC) has achieved financial closing and has simultaneously broken ground, said Longroad Energy. Construction cost of the new solar power plant located in Winkler

The UK-based mineral resources company said that the exploration drilling program is targeting conversion of resources to reserves to extend the current mine life of Yanfolila Gold Mine
The post Hummingbird launches drilling campaign to extend life of Yanfolila Gold Mine in Mali appeared first on Compelo.

The plant will be located in the south of California, in the territory of the Imperial County, which is destined to become one of the main international hubs
The post Saipem signs MoU with California Ethanol & Power appeared first on Compelo.

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.