Energy Update

You are here

(Tue, 30 Aug 2022) These maps show the locations and types of production of the horizontal oil- and natural gas-producing wells installed in the Permian Basin for each consecutive year starting in 2010 through 2021.

LG Energy Solution and Honda Motor Co. said they plan to invest $4.4 billion to set up U.S. manufacturing to jointly produce lithium-ion batteries to power Honda and Acura EV models for the North American market.

The partners aim to have an annual production capacity at the plant of around 40 GWh.

Contributed by Rupert Pearce, CEO, Highview Power

The PGA Tour Championship tournament said it swapped diesel with renewable fuels for all onsite generation to power the East Lake Golf Club in Atlanta.

Renewable fuels are often produced from a combination of previously used materials, such as combining waste and residues with renewable and vegetable oils.

PowerSecure, a Southern Company subsidiary, provided the renewable fuel.

(Mon, 29 Aug 2022) We have updated the <em>Coal Mine Production—Mine level data</em> and <em>Shipments of coal to the electric power sector—by mine/plant</em> maps on our Coal Data Browser. These updates include access to a more functional map viewer, which launches from the <em>View in dynamic map viewer</em> link on the existing webpage and opens in a new tab.

(Mon, 29 Aug 2022) We have updated the <em>Electricity generation and consumption—Plant level data</em> map on our Electricity Data Browser and <a href='/beta/electricity/data/browser/'>Electricity Data Browser (Beta)</a>. These updates include access to a more functional map viewer, which launches from the <em>View in dynamic map viewer</em> link on the existing webpage and opens in a new tab.

Amazon has signed a green hydrogen supply deal with Plug Power as part of the company's effort to achieve net-zero carbon operations by 2050.

By SARAH RANKIN Associated Press

RICHMOND, Va. (AP) — State regulators said Aug. 24 they would consider additional arguments about whether Dominion Energy Virginia’s plans to build a massive offshore wind farm should include a ratepayer protection that the utility has said will kill the project.

Turbine manufacturer Vestas has completed the V236-15.0 MW prototype nacelle at the factory in Lindø, port of Odense, Denmark.

This prototype nacelle is the first manifestation of Vestas’ modular nacelle design and has been applied to Vestas’ latest EnVentus onshore turbines – the V162-7.2 MW and V172-7.2 MW. 

The company behind BUBBLE WRAP is now powering 98% of its Madera, California manufacturing facility with a solar+storage project.

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.