It’s been over a year since Seth Clare joined Platts through the Commodity Associate Program. He shares his experiences in The Barrel blog.
As locations for large-scale solar deployment go, Bermuda is a pretty good one. The climate guarantees plenty of sun and the potential for significant generation of clean energy. The National Museum of Bermuda has capitalized on the advantageous conditions with the recent launch of the largest ground-mounted solar project in the country.
When utility executives make decisions about building new power plants, a lot rides on their choices. Depending on their size and type, new generating facilities cost hundreds of millions or even billions of dollars. They typically will run for 40 or more years — 10 U.S. presidential terms. Much can change during that time.
KPE announced it has been awarded a contract valued in excess of $100m by Targa Pipeline Mid-Continent WestTex to provide engineering, procurement and construction for a 200 MMSCFD natural gas cryogenic processing facility located near Midkiff, in the Permian Basin of West Texas.
Solar Spectrum, a clean-energy company backed by private equity firm Northern Pacific Group, bought residential system provider Horizon Solar Power.
(Wed, 23 Aug 2017) Multiple record-breaking heat waves swept across the western United States this summer, with the latest occurring in the Pacific Northwest on August 1-4, 2017. Coincident with the hot weather, some of the largest electricity balancing authorities in the area experienced record high summer electricity demand on their systems.
India’s Oil and Natural Gas Corp (ONGC) stated that its board of directors has approved in principle the acquisition of a 51% stake in Hindustan Petroleum (HPCL) from the Indian government.
Petroleum Safety Authority (PSA) has given Eni Norge (Eni) consent to use the Floatel Endurance mobile accommodation facility on the Goliat field in the Barents Sea.
Petroleum Safety Authority (PSA) has given Eni Norge (Eni) consent for exploration drilling in block 7122/10 in the Barents Sea.
Glacier Energy Services have signed a master services agreement with PX for the supply of heat exchangers and supporting services.
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.