Early 2018 IKM Cleandrill will start their first offshore operations in the Caspian Sea, after being awarded a contract for riserless mud circulating system services by Total E&P ABSHERON BV on behalf of JOCAP, Joined Operating Company for Absheron Project, JV between SOCAR (50%) and TOTAL (50%).
Grid operators and traders thought they were totally prepped for the historic U.S. solar eclipse. There was just this one thing they didn’t completely factor in: “irregular human-behavior patterns.”
The U.S. Department of Energy’s National Renewable Energy Laboratory and Clean Energy Group (CEG) have released the first comprehensive public analysis detailing the potential size of the commercial behind-the-meter battery storage market in the United States.
Sunrun yesterday said it has reached an agreement with Comcast for the solar and storage company to be the exclusive solar provider for Comcast Cable.
Now that the US Department of Energy staff has released its report to Secretary Perry on Electricity Markets and Reliability, Renewable Energy World has received many comments from industry that seem to generally favor the results
(Fri, 25 Aug 2017) Hurricane Harvey strengthened to a Category 1 hurricane Thursday afternoon and is currently forecast to make landfall over southeast Texas later today or early Saturday.
The nine Northeastern and Mid-Atlantic states participating in the Regional Greenhouse Gas Initiative (RGGI) yesterday said that they have proposed a regional emissions cap trajectory that will provide an additional 30 percent cap reduction by the year 2030, relative to 2020 levels.
In April, newly appointed U.S. Secretary of Energy Rick Perry called for a study of the U.S. electricity grid. He wanted the study to reveal why so many coal plants were retiring and whether or not energy policies (renewable folks, think the ITC, PTC, RPS) were distorting the market and making the grid unstable.
Forward-looking utilities such as San Diego Gas and Electric (SDG&E) are piloting projects that will help them figure out not just how to use them to strengthen the grid but also how to compensate those DER owners for the use of their equipment.
(Thu, 24 Aug 2017) During the solar eclipse that passed across the continental United States on August 21, 2017, solar output on the California Independent System Operator (CAISO) electric system dropped while the sun was partially obscured.
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.