Energy Update

You are here

The 71 MWdc project, which is about 30 miles east of Raleigh, was developed and is currently being built by Cypress Creek Renewables, a leading national solar developer,

APA owns and operates natural gas and electricity assets across mainland Australia. The unsolicited, indicative, non-binding and conditional proposal to acquire all of the issued stapled securities in

The offshore wind farm is located about 27km off Blakeney Point on the North Norfolk coast and 28km off the Lincolnshire coast at Chapel St Leonards. It is
The post Ørsted inaugurates 573MW Race Bank offshore wind farm appeared first on Compelo.

The metallurgical coal market has been abuzz with chatter since reports last week of a $70 billion package proposed by China to narrow its significant trade deficit with the US.

(Wed, 13 Jun 2018) The United States exported 186,000 barrels per day (b/d) of jet fuel in 2017, the eleventh consecutive year of increasing gross jet fuel exports. Almost two-thirds (62%) of U.S. jet fuel exports went to countries in Latin America and the Caribbean, especially Mexico. Relatively high domestic production and a growing international aviation industry have established the United States as a net exporter of jet fuel for the seventh straight year.

The coal deposit is part of an A$30m ($22.8m) deal to acquire two coal tenements MDL137 and EPC728 located near Stanmore Coal’s Isaac Plains coal mine in central
The post Stanmore Coal to buy Wotonga South coal deposit from Peabody Australia appeared first on Compelo.

The Tanzanian government has issued an Environmental and Social Impact Assessment (ESIA) Certificate in this regard to the Australia-based wind energy developer’s local subsidiary Windlab Developments Tanzania. The

Operated by Gas and Power, a Daigas Group company, the new power plant with a rated generation capacity of 140.5MW has commenced operations, said MHPS. As part of
The post MHPS completes gas turbine replacement at Torishima Energy Center in Osaka appeared first on Compelo.

The offtakes from the Canadian cobalt mine and concentrator, located on the north coast of Labrador, will begin from 1 January, 2021. Vancouver-based Wheaton has agreed to pay

The projects will be realized under the country’s Feed-in-Tariff (FiT) scheme and the two plants are expected to produce about 106,000 MWh per year. Land will be leased
The post Scatec Solar agrees to build two solar farms in Ukraine appeared first on Compelo.

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.