Energy Update

You are here

(Thu, 14 Jun 2018) In December 2017, the passage of Public Law 115-97 required the U.S. Secretary of the Interior to establish and administer a competitive oil and natural gas program for the leasing, development, production, and transportation of oil and natural gas in and from the coastal plain of the Arctic National Wildlife Refuge (ANWR). Previously, ANWR was effectively under a drilling moratorium.

Connecticut today selected Deepwater Wind’s Revolution Wind proposal for development as part of an approximately 250-MW round of renewable energy projects.

Brazilian utility Engie Brasil has announced a US$160 million public offering, with funds earmarked for investment into the Jaguara and Miranda hydropower plants.

Tharisa has paid $4.5m for the stake to take part in the tier one resource located on the Great Dyke, which is known to hold huge PGM deposits.
The post Tharisa acquires 27% stake in Zimbabwe-focused PGM producer Karo Mining appeared first on Compelo.

The Maritime Link will transmit clean, renewable energy, generated in Newfoundland and Labrador to the North American grid in Nova Scotia, while reducing dependence on fossil fuels. ABB
The post ABB commissions 500MW HVDC interconnector in Canada appeared first on Compelo.

The Swiss technology company said that the microgrid solution will help the ESCRI project to strengthen the electricity grid while enhancing power reliability. The multipurpose microgrid solution will

The first order for setting up a 20 MW SPV power plant has been placed on BHEL by Gujarat Alkalies and Chemicals Limited (GACL), while the other for
The post BHEL bags EPC contracts for 30MW solar projects in Gujarat, India appeared first on Compelo.

Located in the metropolitan borough of North Tyneside, near Newcastle, in the UK, the €20m stand-alone battery energy storage system (BESS) is supported by a four-year Enhanced Frequency
The post Enel commissions 25MW Tynemouth battery energy storage system in UK appeared first on Compelo.

The Australian energy company has signed a development agreement (DA) and an associated 20-year gas transportation agreement (GTA) in this regard with AGL Energy. APA expects to invest
The post APA to build gas pipeline for AGL Energy’s Crib Point LNG import jetty appeared first on Compelo.

Located at Pistoolhaven in Rotterdam’s Europoort industrial area, Netherlands, the Enecogen power plant is said to be the most efficient of its kind in the Netherlands and one
The post Ørsted to sell 50% stake in 870MW Enecogen power plant to CCI appeared first on Compelo.

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.