Kunama-1 is located on the R3 portion of the R3/R4 PSC Area in the Agadem Basin, south east Niger. As with the other wells in this campaign, Kunama-1
The post Savannah Petroleum spuds Kunama-1 well in Niger’s Agadem Basin appeared first on Compelo.
Planned to be built at Ratnagiri, 346km south of Mumbai in Maharashtra, India, the 1.2 million barrels per day integrated refinery and petrochemicals complex will be implemented by
The post ADNOC, Saudi Aramco partner to develop $44bn Indian refinery appeared first on Compelo.
The first wind farm will be located in North Shade and New Haven Townships in Gratiot County, Michigan. It will include a total of 75 wind turbines and
The post CMS Energy to buy 250MW wind farms in US appeared first on Compelo.
The Canadian mineral exploration company said that initial drilling at Nacimientos yielded encouraging copper-gold results. According to NGEx, the Nacimientos Project is a district-scale land package that is
(Tue, 26 Jun 2018) Starting with the May 2018 release of the <em>Petroleum Supply Monthly</em>, EIA now publishes U.S. petroleum export data by region, defined as Petroleum Administration for Defense District (PADD), of origin and by country of destination. Before this change, users could only see the total amount exported from each U.S. PADD, but not the actual destination associated with those PADD-level exports.
The contract is valid for three years, with two additional one-year options (3+1+1). HydraWell will provide support out of its office and operational hub in Aberdeen, UK. HydraWell
The company said that it had detected a leak of synthetic-based mud (drilling fluid) in the drilling fluid system, about 30m below the sea surface, during routine drilling
The post BP suspends drilling operations in Scotian Basin after fluid spill appeared first on Compelo.
Located immediately south and west of the existing Jonah Gas Field in Sublette County, Wyoming, the Jonah Energy’s NPL projects involves drilling up to 3,500 directional natural gas
The post US BLM releases final EIS for NPL natural gas project in Wyoming appeared first on Compelo.
The Blyth off-shore wind farm, which is located 5.7km off the coast of Blyth, Northumberland coast, is made up of five turbines, each having a capacity of 8.3MW.
The post EDF inaugurates Blyth wind farm and West Burton B battery storage project appeared first on Compelo.
The coal gasification furnace will serve as the core of the 540MW Nakoso integrated coal gasification combined cycle (IGCC) plant which is under construction by Nakoso IGCC Power
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.