PLAT-I platform, which hosts four SCHOTTEL HYDRO SIT 250 turbines, has completed the first phase of its testing programme at Connel, on the West coast of Scotland. The
The post Sustainable Marine Energy completes testing of PLAT-I tidal energy platform appeared first on Compelo.
The Gorgon LNG project has a total production capacity of about 2.6 billion cubic feet of natural gas and 20,000 barrels of condensate per day. Under the contract,
The Cyclops Cobalt-Nickel Project is in close proximity to the Cyclops mountain range on the north coast of Papua Province. At the project, the planned drilling program will
The oil and gas giant said that the FID gives more momentum to its production growth in the North Sea after its decision to redevelop the Penguins oil
The post Shell reaches FID on Fram gas and condensate field in UK North Sea appeared first on Compelo.
The Company currently holds a 50% non-operated interest in the Icacos Field, via its subsidiary Leni Trinidad Limited (“LTL”). The other joint venture partner is Touchstone Exploration Inc
The post Columbus Energy to buy out Touchstone’s 50% stake in Icacos field appeared first on Compelo.
As the winning bidder for the project, Sembcorp will build, own, operate and maintain grid-tied rooftop solar systems with a total capacity of 50MW across 848 HDB blocks
The post Sembcorp secures 50MW solar project in Singapore appeared first on Compelo.
Kunama-1 is located on the R3 portion of the R3/R4 PSC Area in the Agadem Basin, south east Niger. As with the other wells in this campaign, Kunama-1
The post Savannah Petroleum spuds Kunama-1 well in Niger’s Agadem Basin appeared first on Compelo.
The partners made the oil discovery at the Kalimba-1 NFW well located in a water depth of 458m. Drilled to a total depth of 1,901m using West Gemini
The post Eni makes new oil discovery offshore Angola appeared first on Compelo.
According to Petrobras, the Tartaruga Verde field has good quality oil (27º API). It is located in the southern part of Campos Basin, in the post-salt, and is
The post Petrobras begins production from Tartaruga Verde field in Campos Basin appeared first on Compelo.
Through the deal, Advent will own GE’s Jenbacher and Waukesha gas engines and also Distributed Power’s manufacturing plants located across Austria, Canada and the US. Distributed Power’s product
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.