The SLNG project involves installation of a floating storage and regasification unit (FSRU) 6km off the coast of the island of Moheshkali in the Cox Bazar District of
The post Japan’s Mitsubishi to buy stake in Bangladesh LNG terminal appeared first on Compelo Energy.
(Fri, 17 Aug 2018) In May 2018, coal inventories, or stockpiles, in the electric power sector totaled 128 million short tons (MMst), 34 MMst (21%) lower than in May 2017, and the lowest at that time of year since 2014. Stockpiles have averaged 35 MMst (22%) lower during the first five months of 2018 compared with 2017.
In May, Women in Mining (WIM) – a non-profit organisation dedicated to promoting the employment, retention and progress of women in the mining and minerals sector – launched
The post Nominations in for Top 100 Global Inspirational Women in Mining appeared first on Compelo Energy.
Developed in partnership with IHI, the 10MW/20 MWh system is designed to help reduce Global Adjustment charge for an industrial customer. Consisting of up to 70% of the
The post Convergent commissions 10MW/20MWh energy storage system in Canada appeared first on Compelo Energy.
Eskay Creek lies within the traditional territory of the Tahltan Nation and Skeena has an excellent working relationship with the Tahltan Central Government. This first phase of exploratory
Drilling will focus on testing a number of geophysical anomalies interpreted to be related to near surface nickel, cobalt and copper (“Ni-Co-Cu”) mineralization. Drilling is expected to commence
The Plantain exploration prospect will be drilled first followed by a contingent side-track to appraise the Agar oil field, discovered in 2014. Operator volumes in Agar and Plantain
The post Faroe Petroleum farms into Agar-Plantain Well in North Sea appeared first on Compelo Energy.
Located in the eastern part of the French overseas territory, the Maripa gold project features up to five contiguous exploration permits (PER) and is spread across an area
The post Columbus Gold to acquire 70% stake in Maripa gold project from IAMGOLD appeared first on Compelo Energy.
The solar projects involved in the transaction, are the 142MW Colonial Trail West Solar and the 98MW Spring Grove Solar I, which will both be built in Surry
The post Urban Grid offloads 240MW solar projects in Virginia to Dominion Energy appeared first on Compelo Energy.
The Nord Stream 2 export gas pipeline project has been designed to deliver Russian natural gas to the European Union via the Baltic Sea. Its latest permit has
The post Russia grants final permit for Nord Stream 2 offshore export gas pipeline appeared first on Compelo Energy.
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.