Energy Update

You are here

These are engineering, procurement and construction (EPC) and operation & maintenance (O&M) contracts. The solar projects are part of the South Africa’s REIPPPP Programme Round 4. The total
The post juwi to build 250MW solar projects in South Africa appeared first on Compelo Energy.

Through the farm-in agreement, AusQuest stands to acquire a stake of 65% in the licenses should it complete 13,000m of drilling over 7.5 years. The Australian exploration company

Construction activities at the battery storage facility are expected to begin in the coming weeks. The total estimated cost of the facility is A$38m ($27.69m). Infigen Energy has
The post Infigen Energy invests in 25MW battery in South Australia appeared first on Compelo Energy.

The ZAR1.74bn ($118.1m) Elikhulu tailings retreatment project is estimated to yield an average of around 55,000oz of gold annually through its 14 years of operational life. Originally, the

The drill program at Porter Idaho will consist of up to 3,000 meters of diamond drilling on the property, and is designed to test two main areas of
The post Strikepoint Gold starts drilling at Porter Idaho Project in British Columbia appeared first on Compelo Energy.

The discovery has been made at well 15/3-11 on the 15/3-4 (Sigrun) located in production license 025, following drilling. Drilled about 10km southeast of the Gudrun field in
The post Norway’s Equinor makes oil and gas discovery near Gudrun field in North Sea appeared first on Compelo Energy.

The SLNG project involves installation of a floating storage and regasification unit (FSRU) 6km off the coast of the island of Moheshkali in the Cox Bazar District of
The post Japan’s Mitsubishi to buy stake in Bangladesh LNG terminal appeared first on Compelo Energy.

(Fri, 17 Aug 2018) In May 2018, coal inventories, or stockpiles, in the electric power sector totaled 128 million short tons (MMst), 34 MMst (21%) lower than in May 2017, and the lowest at that time of year since 2014. Stockpiles have averaged 35 MMst (22%) lower during the first five months of 2018 compared with 2017.

In May, Women in Mining (WIM) – a non-profit organisation dedicated to promoting the employment, retention and progress of women in the mining and minerals sector – launched
The post Nominations in for Top 100 Global Inspirational Women in Mining appeared first on Compelo Energy.

Developed in partnership with IHI, the 10MW/20 MWh system is designed to help reduce Global Adjustment charge for an industrial customer. Consisting of up to 70% of the
The post Convergent commissions 10MW/20MWh energy storage system in Canada appeared first on Compelo Energy.

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.