Energy Update

You are here

The drill program at Porter Idaho will consist of up to 3,000 meters of diamond drilling on the property, and is designed to test two main areas of
The post Strikepoint Gold starts drilling at Porter Idaho Project in British Columbia appeared first on Compelo Energy.

The discovery has been made at well 15/3-11 on the 15/3-4 (Sigrun) located in production license 025, following drilling. Drilled about 10km southeast of the Gudrun field in
The post Norway’s Equinor makes oil and gas discovery near Gudrun field in North Sea appeared first on Compelo Energy.

The Madison-based technology company recently signed an agreement to provide two nuclear fuel inspection systems for a major US company that provides a wide range of nuclear power
The post Phoenix bags contracts to deliver nuclear fuel inspection solutions appeared first on Compelo Energy.

IBT Group, Capstone’s distributor in Italy, secured the orders that are expected to be commissioned by the end of the calendar year. IBT Group will supply the Capstone
The post Capstone to supply microturbines for Italian wastewater treatment plants appeared first on Compelo Energy.

The project consists of two Aspiral Smart Packaged wastewater treatment units that will be commissioned within three months. The contract is for the supply and installation of two

The approval is for the four spreads to be laid from the Edmonton Terminal to the pipeline project’s Darfield Pump Station, north of Kamloops in the British Columbia
The post NEB approves four spreads of Trans Mountain pipeline expansion project appeared first on Compelo Energy.

These are engineering, procurement and construction (EPC) and operation & maintenance (O&M) contracts. The solar projects are part of the South Africa’s REIPPPP Programme Round 4. The total
The post juwi to build 250MW solar projects in South Africa appeared first on Compelo Energy.

Through the farm-in agreement, AusQuest stands to acquire a stake of 65% in the licenses should it complete 13,000m of drilling over 7.5 years. The Australian exploration company

Construction activities at the battery storage facility are expected to begin in the coming weeks. The total estimated cost of the facility is A$38m ($27.69m). Infigen Energy has
The post Infigen Energy invests in 25MW battery in South Australia appeared first on Compelo Energy.

The ZAR1.74bn ($118.1m) Elikhulu tailings retreatment project is estimated to yield an average of around 55,000oz of gold annually through its 14 years of operational life. Originally, the

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.