Iberdrola has announced that assembly of the first turbine unit for the 880-MW Gouvaes hydro plant has begun, signaling a key milestone in the construction of the 1,158-MW Tamega Hydroelectric Complex in Portugal.
World-leading UNSW Sydney researcher Professor Joe Dong has secured more than $2m in funding from Chinese wind power giant Goldwind for research projects including an Australian-first lab to
The global debate over the merits and dangers of nuclear power has been raging for more than half a century. Critics such as Greenpeace insist that nuclear power
The post Nuclear power generation increases for fifth successive year, reports WNA appeared first on Compelo Energy.
The approval is for the four spreads to be laid from the Edmonton Terminal to the pipeline project’s Darfield Pump Station, north of Kamloops in the British Columbia
The post NEB approves four spreads of Trans Mountain pipeline expansion project appeared first on Compelo Energy.
These are engineering, procurement and construction (EPC) and operation & maintenance (O&M) contracts. The solar projects are part of the South Africa’s REIPPPP Programme Round 4. The total
The post juwi to build 250MW solar projects in South Africa appeared first on Compelo Energy.
Through the farm-in agreement, AusQuest stands to acquire a stake of 65% in the licenses should it complete 13,000m of drilling over 7.5 years. The Australian exploration company
Construction activities at the battery storage facility are expected to begin in the coming weeks. The total estimated cost of the facility is A$38m ($27.69m). Infigen Energy has
The post Infigen Energy invests in 25MW battery in South Australia appeared first on Compelo Energy.
The ZAR1.74bn ($118.1m) Elikhulu tailings retreatment project is estimated to yield an average of around 55,000oz of gold annually through its 14 years of operational life. Originally, the
The drill program at Porter Idaho will consist of up to 3,000 meters of diamond drilling on the property, and is designed to test two main areas of
The post Strikepoint Gold starts drilling at Porter Idaho Project in British Columbia appeared first on Compelo Energy.
The discovery has been made at well 15/3-11 on the 15/3-4 (Sigrun) located in production license 025, following drilling. Drilled about 10km southeast of the Gudrun field in
The post Norway’s Equinor makes oil and gas discovery near Gudrun field in North Sea appeared first on Compelo Energy.
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.