The Fairview Energy Center, which is being constructed with an investment of $700m in Jackson Township, Cambria County, is slated to enter into operations in December 2019. Announced
The post CPV selects NAES as operator of 1GW Fairview Energy Center appeared first on Compelo Energy.
Royal Caribbean Cruises has signed the agreement for the Reading wind facility of Southern Power. Located in the Osage and Lyon Counties, Kansas, the facility is claimed to
The post Royal Caribbean signs deal for Southern Power’s 200MW wind farm to offset emissions appeared first on Compelo Energy.
Sebigas was awarded this contract by Raízen-Geo, a joint venture company between Shell and Cosan. This biogas plant will be located in the area of Raízen’s ethanol and
The post Sebigas secures construction contract for biogas plant in Sao Paulo, Brazil appeared first on Compelo Energy.
The Powder River Basin midstream assets acquired by Silver Creek in the all-cash deal include the Powder River Basin Pipeline and the associated crude oil gathering system and
The post Silver Creek acquires Genesis’ Powder River Basin midstream assets appeared first on Compelo Energy.
Atlantida is an advanced project which combines mineral rights from two separate owners and includes an extensively drilled copper-gold deposit with an historic resource estimate. By consolidating the
Core Appalachia is a producer and processor of natural gas in the Devonian region with operations spread over 1.3 million net acres in Kentucky, Virginia and West Virginia.
The post Diversified Gas & Oil acquires Core Appalachia from TCFII Core appeared first on Compelo Energy.
Schneider Electric announced Wednesday that it has a $5.2 million contract to design, engineer and build a new microgrid at the Port of Long Beach in southern California. The port also is going to get a huge infusion of electric vehicle infrastructure from utility Southern California Edison.
While price is one of the key drivers to integrate renewables in mines, solar alone is no more the lone influencer
Under the contract, the company will be responsible for the engineering, procurement, construction, mobilization, installation and operation of the FPSO at the Area 1 project. MODEC has received
The post MODEC to supply FPSO for Eni’s Area 1 project in Mexico appeared first on Compelo Energy.
(Fri, 12 Oct 2018) EIA forecasts that natural gas inventories will reach 3,263 billion cubic feet (Bcf) at the end of October in its recently released October <em>Short-Term Energy Outlook</em> (STEO), the lowest end-of-October level for U.S. natural gas inventories since 2005. Lingering cold temperatures in April 2018, the coldest April in the past 21 years, delayed the start of the natural gas storage refill season by about four weeks.
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.