Energy Update

You are here

The Uskmouth Power Station is set to be converted from coal power to generate power from 100% waste derived energy pellets. After its conversion, the power plant will
The post WSP, RJM win FEED contract for Uskmouth Power Station conversion appeared first on Compelo Energy.

Under the SPA, Serica Energy (UK) will acquire 16% interest in the Bruce field and 31.83% interest in the Keith field and associated infrastructure (BHP Assets) from BHP
The post Serica Energy to acquire BHP interests in Bruce and Keith fields appeared first on Compelo Energy.

The Planalto Copper Project, which is made up of three exploration licenses covering meta-volcano-sedimentary sequences and intrusives of early Proterozoic-age with IOCG-type mineralization, is located in the Carajás

Facebook Inc. plans to light up a data center in Huntsville, Alabama, with power from the largest solar installations to be built in Tennessee and Alabama.

Each woman appointed to a corporate board reduces the firm's risk of being hit with an environmental lawsuit by 1.5 percent, according to a new analysis published in the Journal of Corporate Finance. In fact, board gender diversity is among the top three factors predicting a company's vulnerability to environmental lawsuits.

The battery boom is coming to China, California and basically everywhere else — and it will be even bigger than previously thought.

The Kaua’i Island Utility Cooperative (KIUC) has executed a contract for design, engineering and construction services for the West Kauaʿi Energy Project in Hawaii with EPC contractor McMillen Jacobs Associates.

Marifil Mines said that the NW Vein System has been discovered at the San Roque project in a zone that hasn’t been drill tested yet. The Canadian firm
The post Marifil Mines discovers new gold system at San Roque project in Argentina appeared first on Compelo Energy.

The 230,000 bpd Duqm Refinery project is located at the Special Economic Zone in Duqm (SEZAD) along the south-east coast of the Sultanate of Oman. The project involves
The post Duqm Refinery project of Oman secures $4.6bn multi-source financing appeared first on Compelo Energy.

The three months contract, with options to extend, will see Telford 25 support a wide range of services from installation of subsea structures and piles, flexible pipelay, and saturation diving for

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.