Energy Update

You are here

California’s Great America, Santa Clara’s 100-acre amusement park, will cover 100 percent of its electricity use with renewable energy through Silicon Valley Power's Santa Clara Green Power program.

Under California’s current trajectory, the state’s first offshore wind farm could be completed in waters near Morro Bay and begin sending power to the grid by 2025, according to Karen Douglas, Commissioner, California Energy Commission.
 

California utility San Diego Gas & Electric last week signed contracts for five new four-hour battery storage facilities for a total of 83.5 MW. 
 

Imtex Membranes Corp. put the spotlight on innovation with their participation at the 29th Ethylene Producers Conference (EPC), held in conjunction with the annual American Institute of Chemical Engineers (AIChE) Spring Meetings on March 26-30, in San Antonio, Texas.

The U.K. had its first full day without burning coal to make electricity since the Industrial Revolution more than a century ago, according to grid operator National Grid Plc.

London-based solar firm VivoPower International last week said that its subsidiary has signed a joint venture agreement that will give it the right to acquire solar projects in a 1.8-GW portfolio to be developed in the U.S. by Innovative Solar Systems.

NRG Energy Inc., the largest independent U.S. power producer, completed a 20-MW solar farm in California that supplies power for Cisco Systems Inc.’s headquarters.

The introduction of sweeping reforms by India’s National Democratic Alliance government since they came into power in 2014 has given a new momentum to India’s manufacturing sector.

(Mon, 24 Apr 2017) The electricity generated by a solar photovoltaic (PV) system depends on the orientation and tilt of the PV panels, and in some cases, its ability to track the sun throughout the day. Because photovoltaic panels operate more efficiently when oriented directly at the sun, some systems use solar-tracking technology to increase electricity generation by rotating the panels along one or two axes.

Gaz Métro’s subsidiary Gaz Métro LNG has completed its expansion project, which will triple its natural gas liquefaction capacity in Canada.

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.