Energy Update

You are here

Empyrean Energy, the oil and gas development company with interests in China, Indonesia and the United States, announced that it has appointed Gajendra (Gaz) Bisht as a director of the Company with immediate effect.

Incremental Oil and Gas Ltd (Incremental Oil And Gas) has announced its entry in to the Williston Basin with the spud of the Hanson 43-43 located within the Newporte Field.

Rockhopper Exploration plc (Rockhopper Exploration), the oil and gas company with key interests in the North Falkland Basin and the Greater Mediterranean region, is pleased to provide the following operational and corporate update.

Senex Energy announces it has commenced its Phase 2 drilling campaign in the Surat Basin on its flagship Western Surat Gas Project.

Jacobs Engineering Group has signed an engineering services agreement with Keyera Partnership, which operates one of the largest independent midstream energy companies in Canada.

According to the results released last week of an independent breach analysis by North Carolina Dam Safety, property damage from a failure of the hurricane-damaged Woodlake Dam, located on the Lower Little River in Vass, N.C., could be in excess of US$260 million.
 

The lights of the high-end boutiques and bars of Tokyo’s Ginza neighborhood may someday be powered by wind farms or coal burned more than 1,700 miles away (2,700 kilometers) in Mongolia, electricity zipping over ultra-high voltage lines across deserts and under seas.

The U.K.’s search for 100 billion pounds (US$127 billion) to maintain electricity supplies is likely to become tougher after the Conservative government lost its parliamentary majority in an election last week.

A collaborative initiative from London-based Carbon Trust will bring together a group of energy companies to investigate use cases for energy storage that will help cut costs associated with integrating wind energy into the UK power grid.

Dubai Electricity & Water Authority announced today it has awarded a US$15.8 million consultancy contract to France’s EDF for the US$523 million 250-MW pumped-storage project at Hatta Dam, located in Dubai, United Arab Emirates.
 

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.