Energy Update

You are here

Power to the Johan Sverdrup project will be sourced from the onshore grid and converted to DC at a transformer station located at the project’s converter station at

The company is expected to commence mining activities at Red Dog gold deposit in early August. While AngloGold Ashanti will purchase all ore produced at the Red Dog
The post Matsa Resources to begin mining at Red Dog gold deposit appeared first on Compelo Energy.

The Arequipa regional government in Peru and power distributor Luz del Sur have signed a contract to advance development of the 480-MW Majes Siguas II hydro project.

Annual wind power capacity in the Asia Pacific (excluding China) will reach a peak of 12.1 GW by 2022.

The new vessel is a customised ULSTEIN Alfa Lift design developed by Dutch design company Ulstein Design & Solutions BV (UDSBV) in partnership with OHT. China Merchant Heavy

The Atlantic Sunrise pipeline project is an expansion of the existing Transco natural gas pipeline. It has been designed to supply an additional 1.7 billion cubic feet per
The post Williams Partners on verge of completing Atlantic Sunrise pipeline project appeared first on Compelo Energy.

The Italian oil and gas firm said that the agreement, which is part of the Framework Agreement signed with Sonatrach in April 2017, aims at relaunching exploration and
The post Eni, Sonatrach sign agreements to create gas hub in Algeria’s Berkine basin appeared first on Compelo Energy.

Under the latest contract signed with Rosenberg WorleyParson, Calder will deliver a MEG package that consists of several high pressure pumps including MEG subsea injection pump, MEG jockey
The post PG Flow Solutions bags contract to supply MEG package for Nova field in North Sea appeared first on Compelo Energy.

While First Reserve, a global private equity investment firm, will acquire the Dresser Natural Gas Solutions product line of Baker Hughes, Pietro Fiorentini will buy the GE subsidiary’s
The post BHGE to sell Natural Gas Solutions business for $375m appeared first on Compelo Energy.

The facility will provide rotor hub testing for latest turbines from GE and will also continue to provide blade and other testing, digital tools, research and similar services

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.