Energy Update

You are here

Silver Spruce contracted PRODEMIN, SA de CV to manage the environmental permitting process. “The approval of the Informe Preventivo was a pivotal and significant step for Silver Spruce

Subsea 7’s contract scope includes project management, engineering, procurement, construction and installation of a 5km Pipeline Bundle along with associated well and platform tie-ins, and provision of a
The post appeared first on Compelo Energy.

Under the €120m contract, signed with Barqi Tojik, Andritz will be responsible for the modernization of the equipment including the inspection and repair of nine penstocks, for the

Located in the Kalahari Desert in the Province of Northern Cape, approximately 600km south-west of Pretoria, the Kathu plant features molten salt storage system designed to allow 4.5
The post Sener and Acciona commence salt melting process at 100MW Kathu CSP plant appeared first on Compelo Energy.

The contract with Shell involves a team which will deliver an integrated verification and class project for the operator’s Penguins floating production storage and offloading (FPSO) vessel. DNV

The research is designed to help lay the groundwork for the development of nuclear fusion as a future practical energy source. The research focuses on high priority challenges in
The post US DOE grants $36.4m in funding for fusion energy sciences research appeared first on Compelo Energy.

The deal, which has been signed with Aristus, comprises an initial $675m payment for a 75% stake in the project and a deferred payment of $225m for the
The post KAZ Minerals to acquire Baimskaya copper project in Russia for $900m appeared first on Compelo Energy.

Ayatsil is a heavy crude oil field located 50 miles (80.4km) northwest of Ciudad del Carmen in the Bay of Campeche offshore Mexico. It is located in water
The post McDermott wins subsea tieback contract for Ayatsil field offshore Mexico appeared first on Compelo Energy.

The investment from OMAS, a wholly-owned subsidiary of the diversified Saudi Arabian conglomerate Zahid Group, is expected to strengthen Greencells´ balance sheet and allow it to embark on
The post OMAS acquires 50% stake in Greencells appeared first on Compelo Energy.

Under its contract, Prysmian Group will handle the design, manufacture, supply, termination and testing of the inter–array submarine cables system of Hornsea Project Two. The cables, which are

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.