For the HFT, ENEC has worked closely with the Korea Electric Power Corporation (KEPCO), which is the joint venture (JV) partner as well as the prime contractor for
The 2018 Field Program is a key step in the Company’s ongoing field work in support of the Company’s Graphite Creek deposit pre-feasibility study. The 2018 Field Program
The Australian oil and gas company said that the Barikewa-3 appraisal well, located in petroleum permit PRL9, had encountered 25m of net gas pay within the Toro and
The post Santos reports onshore gas discovery in PNG’s Forelands region appeared first on Compelo Energy.
Under the contract, McDermott will install a flexible flowline, and umbilical and electrical flying leads for the Silvertip field, which forms a part of Shell’s deepwater Perdido development
The MGD Project is located within a northeast-trending belt of Silurian volcanic, volcaniclastic and sediment rocks. The project has considerable coverage of the large regional fault structure located
The project package consists of 10,858 hectares within a group of claims historically focused on nickel-PGE, orogenic gold and VMS deposit types. Glen Indra, Westminster’s President and CEO,
The post Westminster signs LOI to acquire new copper property in Canada appeared first on Compelo Energy.
The Property consists of 31 claim cells totaling approximately 500 hectares, and covers a prospective trend adjacent to the northwest portion of the Company’s 100% owned Black Raven
(Wed, 08 Aug 2018) Based on 2016 EIA data for newly constructed utility-scale electric generators (those with a capacity greater than one megawatt) in the United States, annual capacity-weighted average construction costs for solar photovoltaic systems and onshore wind turbines declined, while construction costs for natural gas generators increased slightly. These three technologies accounted for about 93% of total electric generating capacity added in 2016.
India is all set to comfortably achieve 100 GW of solar energy capacity by 2022 and has already installed solar capacity of 23.12 GW till July this year, Parliament was informed today. The data regarding generation of power from various renewable energy projects is consolidated by the Central Electricity Authority (CEA).
New geothermal capacity in Mexico could rise 300 MW over 10 years.
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.