Energy Update

You are here

The assignment includes project management, time management, detail engineering and building permitting assistance services for the mineral processing plant expansion project. The work will be carried out between

Installed on floating foundation at sea, the three turbines will have a tip height of 190 meters. They will be installed on Principle Power’s triangular, semi-submersible WindFloat foundations and

Yesterday another milestone was reached in California's march toward a 100 percent renewable energy mandate with the passing of SB100 by the Assembly. The bill will require the state to receive 50 percent of its electricity from renewables by 2026; 60 percent by 2030 and 100 percent by 2045.

Next to a wheat field north of London, banks of solar panels in 35 neat rows are generating electricity without any support from the government.

Last month, Delaware Governor John Carney signed Senate Bill 113 into law, enabling Commercial Property Assessed Clean Energy (C-PACE) financing in Delaware. Once implemented, PACE will offer a new method for financing commercial energy efficiency and renewable energy projects.

Operations and maintenance (O&M) expenses for wind power assets will cost the industry about $7.5 billion annually by 2021, according new analysis from IHS Markit. The firm estimates the current North American wind O&M market is valued at approximately $5-6 billion annually, but is expected to exceed $8.3 billion by 2027, an increase of nearly 40 percent.

The Norwegian Ministry of Petroleum and Energy has launched the licensing round for APA 2018 which comprises the predefined areas with blocks in the North Sea, the Norwegian
The post Norway receives bids from 38 firms for APA 2018 licensing round appeared first on Compelo Energy.

The Property represents an integral part of the overall East Cadillac Gold Project, as it covers a 16km strike along the highly prospective Larder Lake – Cadillac Fault,
The post Chalice acquires remaining 30% stake in East Cadillac gold project appeared first on Compelo Energy.

“As a global leader in gas, ABS is committed to enabling innovation in LNG as a marine fuel and this AIP is the latest evidence of that,” said
The post ABS approves Technolog’s LNG fuel gas container system appeared first on Compelo Energy.

This comes on the back of recent key developments for the Company including the successful PFS results referred to above, the appointment of new CEO, Dietrich Wanke, the

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.