The merger of Barrick Gold and Randgold Resources is aimed at creating a major gold company with high concentration of Tier One Gold Assets, which have a stated
The post Barrick Gold to merge Randgold Resources in $18.3bn deal appeared first on Compelo Energy.
EDPR Brasil’s solar plant is located in the Brazilian State of São Paulo and the power purchase agreement is set to come into force in 2022. The Spanish
The post EDPR signs PPA for 199MW Pereira Barreto solar plant in Brazil appeared first on Compelo Energy.
Through the mine acquisition, Peabody is expected to add about two million tons per year of high quality hard coking coal sales. The acquisition includes the purchase of
The post Peabody to acquire Shoal Creek coal mine for $400m appeared first on Compelo Energy.
The two solar plants will each have a capacity of 49MW and will be located in Binh Thuan Province and Long An Province in the country, Sharp stated.
The post Sharp secures contract to build 98MW of solar projects in Vietnam appeared first on Compelo Energy.
The Canadian gold producer has increased consolidated reserves of the Rosebel Gold Mine by 1.6 million ounces to 4.7 million ounces with the Saramacca deposit contributing 1.0 million
The post IAMGOLD reports 51% more reserves at Rosebel Gold Mine in Suriname appeared first on Compelo Energy.
The enlarged company resulting from the merger of Great Panther Silver and Beadell Resources will include three mining operations in Mexico and Brazil in addition to the former’s
The post Great Panther Silver to acquire Brazilian gold producer Beadell Resources appeared first on Compelo Energy.
The newbuild jackup rig, which will be named as Noble Johnny Whitstine, was constructed at the PaxOcean Graha shipyard in Batam, Indonesia. Noble revealed that it has secured
The post Noble buys newbuild jackup rig from PaxOcean appeared first on Compelo Energy.
Electric robo-taxis are a real possibility. Trends in transportation, energy, and demographics indicate that future vehicles will operate autonomously, run on electricity rather than fossil fuels, and be shared instead of privately owned. But before everyone can carpool in self-driving electric cars, we need places to charge them.
California’s ambitious push for clean energy will be a tough lift for utilities and potentially their bondholders.
The permit allows Black Rock Tidal Power to test a 280-kilowatt floating platform, called the PLAT-I, for up to six months. The project will not be connected to
The post Black Rock Tidal secures permit for tidal electricity project in Nova Scotia appeared first on Compelo Energy.
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.