Energy Update

You are here

The technology will extend the life of its DRS1 bauxite residue disposal area and allow Alunorte to continue operations on safe conditions. Following IBAMA’s decision, Alunorte will be

St Barbara will pay Australian Potash $1.25 million cash consideration to enter the Agreement, with a minimum exploration spend of $1.75 million during the initial 12 month Earn-In

The western build of the WB Xpress pipeline will move nearly 760 million cubic feet of natural gas per day to a delivery point on Tennessee Gas Pipeline’s
The post TransCanada commissions phase one of $900m WB Xpress pipeline in US appeared first on Compelo Energy.

Following the completion of the transaction, shareholders of Trinidad Drilling will collectively own about 29% stake in Precision. Precision president and chief executive officer Kevin Neveu said: “This
The post Precision Drilling to acquire Trinidad Drilling in $796m deal appeared first on Compelo Energy.

The project was won in an auction conducted by Karnataka Renewable Energy Development Ltd. The solar plant will be set up at Pavagada Solar Park, one of the
The post Azure Power closes $58m financing for 100MW solar plant in India appeared first on Compelo Energy.

The company is the first company in Mexico and Latin America to join RE100, a global, collaborative initiative of The Climate Group, together with CDP. RE100 brings together the
The post Grupo Bimbo targets to use 100% renewable energy by 2025 appeared first on Compelo Energy.

SINN Power is conducting a study to determine how a renewable energy mix of its wave technology, small wind farms, kinematic hydroelectric plants and solar energy can be used to secure a durable and stable power supply in Guinea.

The North American nation saw its renewable energy capacity shot up to 229.9GW in 2017 from 116.4GW in 2008, according to a report released by the International Renewable
The post Top five biggest wind farms in the US appeared first on Compelo Energy.

The Q4 diamond drilling program at the Rompas-Rajapalot gold-cobalt project will consist of drilling of up to 2,500m to evaluate the Korkiakoivikko and Hirvimaa prospects. According to Mawson
The post Mawson starts diamond drilling at Rompas-Rajapalot gold-cobalt project appeared first on Compelo Energy.

The 250MW solar project, to be built with an investment of around €120m at the Pavagada solar park in Tumkur district, is targeted to be commissioned in the
The post BELECTRIC wins contract for Fortum’s 250MW solar project in India appeared first on Compelo Energy.

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.