Energy Update

You are here

(Thu, 18 Oct 2018) The October 9, 2018 rupture of Enbridge’s BC natural gas pipeline near Prince George, British Columbia, continues to affect natural gas supply, electricity generation, and petroleum refining in the U.S. Pacific Northwest. The BC Pipeline links natural gas production in northeastern British Columbia with distribution markets in Canada as well as Washington, Oregon, and Idaho.

California recently joined other leading states, provinces, cities, and corporations around the world by setting an ambitious 100 percent carbon-free electricity target. It’s a landmark, not because California was the first, but because it is the biggest. The state ranks as the fifth-largest economy in the world.

Voith Hydro Holding GmbH & Co. KG and the Siemens Energy Management Division have signed a letter of intent for collaborating on appropriate hybrid power projects containing hydropower.

According to the Microgrid Market Growth Potential - Industry Size Outlook Report 2024, the microgrid market is expected to reach $19 billion by 2024, nearly five times the original valuation of this business space in 2016.

Located 160km from the Astrakhan port in Russia, the Rakushechnoye field is expected to be brought into commercial oil production in 2023. The anticipated oil production plateau from
The post Lukoil begins construction on infrastructure facilities at Rakushechnoye field appeared first on Compelo Energy.

Earlier this year, the two midstream companies created a joint venture to develop the 128km long Iron Horse Pipeline, which along with the newly added Powder River Express
The post Tallgrass, Silver Creek to expand Powder River Basin joint venture appeared first on Compelo Energy.

The divestment will enable Iberdrola to become a 100% renewable integrated energy business in the UK. The transaction includes the sale of 2,554MW of traditional generation power, which primarily consists
The post Iberdrola to sell UK traditional power generation assets for $925m appeared first on Compelo Energy.

Spanning nearly 850km2, the ELs acquired are contiguous with, or located in close proximity to, the Company’s existing Kilembe-area and Bujagali exploration licenses which, at present, consist of
The post M2 Cobalt to acquire four exploration licenses in Uganda appeared first on Compelo Energy.

EDF Renewables North America stated that this is the first offshore project in New Jersey and it will include three of V164-8.3 MW turbines from MHI Vestas. The
The post MHI Vestas chosen as preferred supplier for 25MW US offshore wind project appeared first on Compelo Energy.

Additionally, Belmont has also reported plans to conduct downhole geophysical surveys to test specific prospective layers for potential aquifers. Drilling is expected to commence shortly. As previously reported,

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.