South Africa plans to expand use of renewable power as the coal-dependent nation expects traditional, centralized generation plants to “disappear,” Energy Minister Jeff Radebe said.
One of the EPCI contracts, related to the Marjan field, is valued between $500-750m while the other is valued at $50-250m, revealed McDermott. The scope of the larger
The post McDermott bags two EPCI contracts for Marjan field offshore Saudi Arabia appeared first on Compelo Energy.
Perhaps more so than any other developed country, China is confronted with the effects of pollution and is therefore establishing vast amounts of renewable energy infrastructure – of
The post What is China’s solar highway? Profiling the 1km energy-producing road in Shandong appeared first on Compelo Energy.
To be installed in Porto Torres, Eni has received the authorization for the construction and operation of project from the region of Sardinia. Eni’s owned company Syndial, which
The post Eni starts construction of 31MW PV plant in Porto Torres appeared first on Compelo Energy.
The execution of the plan is expected to result in a 102% increase in mineral reserves, a 27% boost to average annual copper equivalent production to 116 million
The post Copper Mountain Mining unveils integrated mining plan for BC assets appeared first on Compelo Energy.
EPA stated that this loan will help the city to upgrade its water infrastructure to offer improved water quality to 1.8 million of the city’s residents. Similar to
The post Baltimore wins $200m loan from EPA to modernize wastewater infrastructure appeared first on Compelo Energy.
Highlights of Two-Phase Exploration Program: Cobalt Grades and Location: Phase one reconnaissance sampling program has encountered significant grades of cobalt mineralization in multiple locations, including up to 0.421%
The funding support follows the release of a feasibility study on Project Marlin by TasNetworks which concludes that the second Bass Straight interconnector is technically feasible and viable
The post Australia government offers $40m funding support for 1.2GW Project Marlin appeared first on Compelo Energy.
Under the contract, KBR will provide front end engineering design submittals and services to Pointe LNG as needed to secure the Federal Energy Regulatory Commission (FERC) approval for
The post KBR wins contract for Pointe LNG export facility in Louisiana appeared first on Compelo Energy.
Through a feasibility study, facilitated by the United Nations Office for Project Services, the parties will explore the possibilities of supplying the Eastern Caribbean with renewable ocean energy
Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.