Energy Update

You are here

New Jersey-based utility Public Service Enterprise Group has signed a multi-decade lease for land which will be used as a major manufacturing and assembly port to support the offshore wind industry.

A former coal mine in Southwest Virginia will be redeveloped for a utility-scale solar project.

The collaboration by the Nature Conservancy and Dominion Energy will repurpose 1,200 acres of the former Red Onion surface mine to generate approximately 50 megawatts of solar energy, enough to power 12,500 homes.

Vineyard Wind, the 800-megawatt project offshore Massachusetts, has closed on $2.3 billion of senior debt financing, setting the stage for construction to begin. 

Orbital Marine Power announces it will lead a pan-European consortium to deliver the €26.7 million (US$31.5 million) FORWARD-2030 project, set up to accelerate the commercial deployment of floating tidal energy.

Global energy companies TotalEnergies and Air Liquide have inked a deal to cooperate on the development of green hydrogen and carbon capture technologies in France.

The deal enables TotalEnergies to leverage Air Liquide’s expertise in low-carbon hydrogen production to decarbonize its Normandy platform in France.

Analysis by Sage Energy Consulting estimates the value of California solar could drop 40-80% under the proposed policy change.

Now, we wait.

Contributed by Matt Cramer, ArcVera Renewables

Running power performance tests (PPTs) on operational assets is a highly complex task that requires a significant amount of experience. 

When should I carry out power performance tests?

Utility-scale energy storage startup Key Capture Energy has a new majority owner in a South Korean liquefied natural gas entity.

SK E&S Co. has acquired Key Capture Energy and will provide additional capital for the company’s growth plans in the U.S. Started in 2016. Key Capture holds 254 MW in standalone energy storage projects in construction and operation, with another 3,000 MW in the development pipeline.

UK planning authorities have approved plans for GE Renewable Energy's offshore wind blade manufacturing plant in Teeside.

Pages

GET IN TOUCH

  • 1875 I Street NW, International Square, 
       Washington, District Of Columbia, 20006
  • Phone: +1 (888) 317-3839
  • Email: info@mglllc.com

About

Misha Gerhard & Lewis LLC is International Strategic Consulting Firm with an extensive presence in the most rapidly developing regions of the world.